Monday, June 23, 2008

We have an another room!

Yay! It's painted and everything. Includes working lights and electrical outlets too. I'm really excited. The electrician came on Saturday and did the finishing work and he's supposed to get back to us about moving the meter and the outlet for the air conditioner. We just need to contact an HVAC person to move the air conditioner. But, everything is looking good.

We are going to start putting the flooring down (for under the carpet) and the lattice that we are going to use on the ceiling is on sale this week, so I think that we'll be pretty well settled in with everything by next week.

I don't know when we'll have the final inspections or anything -- we're kind of waiting for the electrician to call the electrical inspector to find out if he needs a new permit or if we can use the old one. I should have Dad call him tomorrow (b/c he's going on vacation Wed) to see if he found the answer out. Otherwise, I'll have to write a letter or call the inspector to get an extension on the "due date". ha ha.

I'm really ready to empty out the downstairs bedroom and some stuff from upstairs to that room. Then when Jake wants to hang out with people and I'm doing something else, he can hang out downstairs.

Otherwise, nothing much going on. Count down to my vacation: 4 days! woot.

Saturday, June 14, 2008

We almost have another room!

The basement has begun to move along nicely since the inspections were finally done at the end of May. In fact, my dad is downstairs right now, sanding the second layer. Then, we can get the finishing parts in there and make everything smooth and nice. The drywall still needs to go on the back side and stuff, but that can be done anytime before the final electrical inspection.

We got the letter regarding the placement of the electrical meter and the air conditioning unit and I'm still not sure what the hell any of it means. I'm hoping that Jake's dad might have more insight into electrical codes for meters and such, but I'm STILL not sure what we have to do to fix it. The letter was incredibly vague (first of all) and second: the idiot at the City sends the letter June 11 and tells us that we have until July 3! to fix it. JULY 3RD!!! Are you fucking kidding me? That's less than 3 weeks from the date that I received the letter -- how the fuck are we supposed to get all of that fixed in three weeks -- especially since the letter says that we have to move the air conditioning unit and the meter? Or something. I'm not really sure to be honest -- like I said, it's really vague, for something so specific.

And on top of that, my dad STILL hasn't called the electrician about it!!! Geez. We've know since the inspection -- if it were me, I would have called right away to find out what the fuck we were supposed do. I'm so frustrated with all of this. If it were just us, we would have just done all this sans permit.


Anyway....

Angrybot.


I have 10 business days left until vacation -- I don't count the weekends, because I don't have to do anything. ha ha.

I have a countdown on my computer at work.

Nothing much else going on. Just here to express my frustration at the whole permit situation in the City of West Allis. :)