The main floor of the house will hopefully be done after this weekend:
The new floor in the kitchen just needs the tiles put down and it'll be ready to go. The window/door trim needs a second coat everywhere and that will be done.
Vacuum and clean the carpets once more and done.
The back office is done
We got a free oven from Jack and Betsy (they found one for free)! It's fairly old, but it is really clean and works good. Electric.
Had a new washer and dryer delivered today and installed. We need to get some boards to put under the dryer to level it out, but otherwise, it's a - ok.
New adventures upstairs then: There were/are mice living in the fiberglass insulation behind the paneling in the upstairs (re: main) bedroom. I have to take off all the stupid decals, which are probably going to just take the plaster off the wall and will have to be filled in a bit. Definitely need a new window at the top of the stairs.
We'll have to plan carefully though. Not much money to do some expensive things. And we already have our first payment coupon for the mortgage. Goodbye $1230. OH, and the $597.50 that we'll owe for rent too. So, I'm trying to save as much as possible so we're not struggling at the beginning of June. I moved my student loan payments to the middle of the month, so we're good there.
Anyway, I will post pictures when it is looking more complete. It looks totally sweet now, but I'll probably wait.
Okay, well, I'm just waiting for my lunch to be done. 3 1/2 mins to go. Watching Dave Chappelle and then back to work for 3 1/2 hours. Then, probably running, since I've been slacking the past two weeks and have only run once. But, I did work my butt off last weekend, so that must count for something. And then to get drywall for the upstairs.
No comments:
Post a Comment